FCASE Myślenice
FCASE Myślenice
Modernization of the ammonia installation consisting of expansion with an additional electric evaporator. As part of the modernization, a control cabinet was built, an electric evaporator was installed and put into operation, and the network was expanded with safety valves. A gas pipeline with an intake point was also constructed, supplying the newly established production line. The installation will be launched in 2023.